Solar-ready new build, four plots

First and second fix across four plots, each pre-cabled for solar, storage and an EV charger from day one.

Placeholder — plot exterior
4
Plots
4.5 kWp
PV per plot
11 weeks
Duration
Part L compliant
Standard

Scope of works

  • First and second fix electrical to all plots
  • In-roof PV provision and cable routes
  • Battery position and isolation pre-wired
  • EV charge point on each driveway

Outcome

Each home was handed over ready for its array with no retro-fit disruption for the buyers.

Every project is handed over with full test certification, an as-installed schedule and a documented aftercare route.