80 kWp warehouse rooftop PV

A distribution unit with a heavy daytime load — an ideal fit for a large, ballasted rooftop array sized to on-site demand rather than export.

Placeholder — aerial of the roof
80 kWp
System size
178
Panels
3 weeks
Duration
Zero downtime
Disruption

Scope of works

  • Half-hourly load profiling and array sizing
  • Ballasted mounting system on a membrane roof
  • Three-phase inverters and metering
  • Remote monitoring and alerting

Outcome

Roughly a third of daytime consumption now comes from the roof, with a projected payback inside six years.

Every project is handed over with full test certification, an as-installed schedule and a documented aftercare route.